Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scout Scoped Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
62,937,527.86
ISK
Sell Value
106,000,000.00
Profit
+43,062,472.14
ISK
Margin
40.6%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 59,325,263.16
22 11,126.94
22 42,095.02
27 81,621.27
Material Total 59,460,106.39
System Cost Index (0.14%) 117,593.96
SCC Surcharge (4%) 3,359,827.51
Job Installation Cost 3,477,421.47
Grand Total 62,937,527.86

Production Timeline

d
Assembly 5h 26m 24s
1
Scout Scoped Dual 1000mm Railgun
Scout Scoped Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills