Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Prototype Precise Dual 1000mm Railgun Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
62,788,299.09
ISK
Sell Value
0.00
Profit
-62,788,299.09
ISK
Margin
0.0%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 59,325,263.16
27 2,161.08
32 5,504.32
33 2,640.66
Material Total 59,335,569.22
System Cost Index (0.14%) 116,758.98
SCC Surcharge (4%) 3,335,970.89
Job Installation Cost 3,452,729.87
Grand Total 62,788,299.09

Production Timeline

d
Assembly 5h 26m 24s
1
Prototype Precise Dual 1000mm Railgun
Prototype Precise Dual 1000mm Railgun M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills