Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scout Scoped Hexa 2500mm Repeating Cannon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
32,050,178.28
ISK
Sell Value
59,000,000.00
Profit
+26,949,821.72
ISK
Margin
45.7%
Build Time
5h 26m 24s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 30,535,686.27
36 108,828.36
36 18,207.72
36 68,882.76
Material Total 30,731,605.11
System Cost Index (0.14%) 44,589.43
SCC Surcharge (4%) 1,273,983.73
Job Installation Cost 1,318,573.17
Grand Total 32,050,178.28

Production Timeline

d
Assembly 5h 26m 24s
1
Scout Scoped Hexa 2500mm Repeating Cannon
Scout Scoped Hexa 2500mm Repeating Cannon M
1 job, 1 run 5h 26m 24s/job 5h 26m 24s
Total Wall Clock Time 5h 26m 24s

Required Skills