Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Zeugma Integrated Analyzer Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
435,691,403.52
ISK
Sell Value
530,735,483.87
Profit
+95,044,080.35
ISK
Margin
17.9%
Build Time
16m 20s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 883,386.53
1 843,900.00
90 54,028,489.50
90 73,421,440.20
90 306,385,900.20
Material Total 435,563,116.43
System Cost Index (0.14%) 4,338.21
SCC Surcharge (4%) 123,948.88
Job Installation Cost 128,287.09
Grand Total 435,691,403.52

Production Timeline

d
Assembly 16m 20s
1
Zeugma Integrated Analyzer
Zeugma Integrated Analyzer M
1 job, 1 run 16m 20s/job 16m 20s
Total Wall Clock Time 16m 20s