Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Apostle Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,818,990,342.85
ISK
Sell Value
4,559,000,000.00
Profit
+740,009,657.15
ISK
Margin
16.2%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
9 118,260,000.00
14 139,195,189.14
18 312,120,000.00
14 173,880,000.00
9 121,950,000.00
9 114,201,582.75
5 91,012,658.25
5 30,500,000.00
9 107,714,380.14
9 74,829,647.16
23 219,456,080.56
14 223,160,000.00
8 108,400,000.00
29 504,310,000.00
5 431,000,000.00
360 16,574,310.00
180 14,569,506.00
1 168,555,555.56
1 731,819,047.62
Material Total 3,701,507,957.18
System Cost Index (0.14%) 3,972,834.30
SCC Surcharge (4%) 113,509,551.37
Job Installation Cost 117,482,385.67
Grand Total 3,818,990,342.85

Production Timeline

d
Assembly 12d 14h 13m
1
Apostle
Apostle M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills