Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Ninazu Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,858,828,717.74
ISK
Sell Value
5,743,000,000.00
Profit
+1,884,171,282.26
ISK
Margin
32.8%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
9 129,960,000.00
14 151,276,502.72
18 261,856,882.08
14 169,260,000.00
9 125,640,000.00
9 117,684,827.55
5 91,200,000.00
5 33,415,000.00
9 130,210,851.06
9 64,296,000.00
23 230,690,000.00
14 262,295,449.08
8 98,103,863.12
29 462,840,000.00
5 401,344,827.60
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
1 784,738,461.54
Material Total 3,736,950,535.82
System Cost Index (0.14%) 4,121,484.41
SCC Surcharge (4%) 117,756,697.51
Job Installation Cost 121,878,181.92
Grand Total 3,858,828,717.74

Production Timeline

d
Assembly 12d 14h 13m
1
Ninazu
Ninazu M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills