Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Lif Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,798,746,077.37
ISK
Sell Value
5,300,000,000.00
Profit
+1,501,253,922.63
ISK
Margin
28.3%
Build Time
12d 14h 13m
1 run

Materials

19 items
Material Quantity Unit Price Total
9 129,960,000.00
9 97,249,180.32
9 130,928,441.04
14 169,260,000.00
9 125,640,000.00
18 235,266,436.80
5 91,200,000.00
5 33,415,000.00
14 202,550,212.76
9 64,278,000.00
23 230,690,000.00
14 262,076,646.72
8 98,088,215.12
29 386,686,468.93
5 412,325,000.00
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
1 784,676,923.08
Material Total 3,676,428,395.84
System Cost Index (0.14%) 4,136,346.72
SCC Surcharge (4%) 118,181,334.81
Job Installation Cost 122,317,681.53
Grand Total 3,798,746,077.37

Production Timeline

d
Assembly 12d 14h 13m
1
Lif
Lif M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills