Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Blueprint Copy Cost Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
678,925,309.03
ISK
Sell Value
2,290,000,000.00
Profit
+1,611,074,690.97
ISK
Margin
70.4%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
15 39,686,494.05
15 182,850.00
15 2,422,446.30
630 124,955,919.90
630 52,724,466.90
630 332,136,000.00
630 33,548,860.80
630 609,386.40
630 2,667,420.00
1,170 83,271,146.40
Material Total 672,205,402.25
System Cost Index (0.14%) 227,243.22
SCC Surcharge (4%) 6,492,663.56
Job Installation Cost 6,719,906.78
Grand Total 678,925,309.03

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set Blueprint Copy Cost Optimization II
Standup M-Set Blueprint Copy Cost Optimization II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII