Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Blueprint Copy Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
6,772,332,451.20
ISK
Sell Value
14,970,000,000.00
Profit
+8,197,667,548.80
ISK
Margin
54.8%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 411.50
144 380,990,342.88
144 1,755,360.00
144 23,255,484.48
6,300 1,249,559,199.00
6,300 527,244,669.00
6,300 3,321,360,000.00
6,300 335,488,608.00
6,300 6,093,864.00
6,300 26,674,200.00
11,700 832,711,464.00
Material Total 6,705,133,602.86
System Cost Index (0.14%) 2,272,424.82
SCC Surcharge (4%) 64,926,423.51
Job Installation Cost 67,198,848.34
Grand Total 6,772,332,451.20

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Blueprint Copy Optimization II
Standup L-Set Blueprint Copy Optimization II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII