Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set TE Research Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
6,240,261,108.20
ISK
Sell Value
14,960,000,000.00
Profit
+8,719,738,891.80
ISK
Margin
58.3%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 493.69
144 377,721,613.44
144 2,893,512.96
144 24,007,844.16
6,300 1,071,000,000.00
6,300 649,518,345.00
6,300 2,937,995,739.00
6,300 328,230,000.00
6,300 5,862,843.00
6,300 29,853,873.00
11,700 750,923,667.00
Material Total 6,178,007,931.25
System Cost Index (0.14%) 2,105,179.90
SCC Surcharge (4%) 60,147,997.05
Job Installation Cost 62,253,176.95
Grand Total 6,240,261,108.20

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set TE Research Optimization II
Standup L-Set TE Research Optimization II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII