Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Dagon Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
4,795,905,883.73
ISK
Sell Value
0.00
Profit
-4,795,905,883.73
ISK
Margin
0.0%
Build Time
15d 2h 40m
1 run

Materials

21 items
Material Quantity Unit Price Total
8 115,520,000.00
9 97,249,180.32
27 392,785,323.12
18 217,620,000.00
19 265,240,000.00
9 117,633,218.40
9 164,160,000.00
6 40,098,000.00
9 130,210,851.06
15 107,130,000.00
27 270,810,000.00
18 336,955,688.64
9 110,349,242.01
15 228,919,230.75
15 200,010,242.55
5 435,275,000.00
5 412,325,000.00
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
1 784,676,923.08
Material Total 4,649,105,771.00
System Cost Index (0.14%) 4,964,255.02
SCC Surcharge (4%) 141,835,857.71
Job Installation Cost 146,800,112.73
Grand Total 4,795,905,883.73

Production Timeline

d
Assembly 15d 2h 40m
1
Dagon
Dagon M
1 job, 1 run 15d 2h 40m/job 15d 2h 40m
Total Wall Clock Time 15d 2h 40m

Required Skills