Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Caiman Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,726,005,131.09
ISK
Sell Value
0.00
Profit
-2,726,005,131.09
ISK
Margin
0.0%
Build Time
12d 14h 13m
1 run

Materials

22 items
Material Quantity Unit Price Total
5 72,200,000.00
4 43,221,857.92
5 72,738,022.80
2 24,180,000.00
2 27,920,000.00
5 65,351,788.00
2 36,480,000.00
18 120,294,000.00
4 57,871,489.36
4 28,568,000.00
18 180,540,000.00
18 168,617,004.30
5 93,598,802.40
2 24,522,053.78
8 170,805,823.76
8 127,422,942.56
2 156,725,128.20
2 160,468,275.86
360 16,453,166.40
180 14,610,630.60
1 191,074,074.07
1 784,676,923.08
Material Total 2,638,339,983.09
System Cost Index (0.14%) 2,964,521.91
SCC Surcharge (4%) 84,700,626.09
Job Installation Cost 87,665,148.00
Grand Total 2,726,005,131.09

Production Timeline

d
Assembly 12d 14h 13m
1
Caiman
Caiman M
1 job, 1 run 12d 14h 13m/job 12d 14h 13m
Total Wall Clock Time 12d 14h 13m

Required Skills