Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup Ballistic Control System II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
69,667,060.53
ISK
Sell Value
104,694,736.84
Profit
+35,027,676.31
ISK
Margin
33.5%
Build Time
12h 7m 37s
1 run

Materials

6 items
Material Quantity Unit Price Total
1 5,036,000.00
5 2,468.45
180 14,004,975.60
450 5,813,847.00
450 8,726,670.00
810 33,687,511.20
Material Total 67,271,472.25
System Cost Index (0.14%) 81,010.23
SCC Surcharge (4%) 2,314,578.04
Job Installation Cost 2,395,588.28
Grand Total 69,667,060.53

Production Timeline

d
Assembly 12h 7m 37s
1
Standup Ballistic Control System II
Standup Ballistic Control System II M
1 job, 1 run 12h 7m 37s/job 12h 7m 37s
Total Wall Clock Time 12h 7m 37s