Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Drekavac Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
125,729,890.19
ISK
Sell Value
167,475,000.00
Profit
+41,745,109.81
ISK
Margin
24.9%
Build Time
1h 48m 49s
1 run

Materials

11 items
Material Quantity Unit Price Total
2,772,000 10,755,360.00
990,000 18,542,700.00
178,200 8,744,274.00
19,800 3,743,190.00
11,880 8,155,026.00
6,930 8,969,013.90
3,465 9,016,068.60
572 27,361,843.08
504 19,358,730.72
99 4,401,674.64
50 4,029,701.50
Material Total 123,077,582.44
System Cost Index (0.14%) 89,691.57
SCC Surcharge (4%) 2,562,616.19
Job Installation Cost 2,652,307.75
Grand Total 125,729,890.19

Production Timeline

d
Assembly 1h 48m 49s
1
Drekavac
Drekavac M
1 job, 1 run 1h 48m 49s/job 1h 48m 49s
Total Wall Clock Time 1h 48m 49s

Required Skills