Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

High-grade Mimesis Gamma Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
53,669,014.42
ISK
Sell Value
189,723,076.92
Profit
+136,054,062.50
ISK
Margin
71.7%
Build Time
1h 21m 36s
1 run

Materials

5 items
Material Quantity Unit Price Total
30 1,491,509.70
35 752,806.60
87 1,583,362.59
234 19,719,180.00
257 28,912,500.00
Material Total 52,459,358.89
System Cost Index (0.14%) 40,906.23
SCC Surcharge (4%) 1,168,749.30
Job Installation Cost 1,209,655.53
Grand Total 53,669,014.42

Production Timeline

d
Assembly 1h 21m 36s
1
High-grade Mimesis Gamma
High-grade Mimesis Gamma M
1 job, 1 run 1h 21m 36s/job 1h 21m 36s
Total Wall Clock Time 1h 21m 36s

Required Skills

Industry IIII