Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Low-grade Hydra Beta Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
59,452,122.29
ISK
Sell Value
118,400,000.00
Profit
+58,947,877.71
ISK
Margin
49.8%
Build Time
54m 25s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 953,300.54
37 795,806.36
63 13,987,314.81
177 19,877,100.00
201 22,576,173.27
Material Total 58,189,694.98
System Cost Index (0.14%) 42,690.78
SCC Surcharge (4%) 1,219,736.53
Job Installation Cost 1,262,427.31
Grand Total 59,452,122.29

Production Timeline

d
Assembly 54m 25s
1
Low-grade Hydra Beta
Low-grade Hydra Beta M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills

Industry IIII