Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

StrikeSnipe Ultra M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
227,537.56
ISK
Sell Value
1,598,486.00
Profit
+1,370,948.44
ISK
Margin
85.8%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 660.90
2 37,592.38
4 160,162.40
36 25,902.72
Material Total 224,318.40
System Cost Index (0.14%) 108.86
SCC Surcharge (4%) 3,110.30
Job Installation Cost 3,219.16
Grand Total 227,537.56

Production Timeline

d
Assembly 1h 18m 34s
1
StrikeSnipe Ultra M
StrikeSnipe Ultra M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s