Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

StrikeSnipe Ultra L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
393,650.87
ISK
Sell Value
2,099,524.00
Profit
+1,705,873.13
ISK
Margin
81.3%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 652.98
4 86,035.04
6 246,132.90
72 54,429.84
Material Total 387,250.76
System Cost Index (0.14%) 216.43
SCC Surcharge (4%) 6,183.68
Job Installation Cost 6,400.11
Grand Total 393,650.87

Production Timeline

d
Assembly 1h 57m 50s
1
StrikeSnipe Ultra L
StrikeSnipe Ultra L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s