Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

R-O Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
18,290,953.46
ISK
Sell Value
23,970,000.00
Profit
+5,679,046.54
ISK
Margin
23.7%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 28,674.00
9 29,822.49
36 17,693,394.48
1 58,229.26
Material Total 17,810,120.23
System Cost Index (0.14%) 16,260.06
SCC Surcharge (4%) 464,573.17
Job Installation Cost 480,833.23
Grand Total 18,290,953.46

Production Timeline

d
Assembly 1h 37m 56s
1
R-O Trigger Neurolink Conduit
R-O Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III