Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

S-R Trigger Neurolink Conduit Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
19,405,125.08
ISK
Sell Value
21,751,386.86
Profit
+2,346,261.78
ISK
Margin
10.8%
Build Time
1h 37m 56s
1 run

Materials

4 items
Material Quantity Unit Price Total
9 26,168.22
9 27,763.47
36 18,709,200.00
1 206,100.00
Material Total 18,969,231.69
System Cost Index (0.14%) 14,740.36
SCC Surcharge (4%) 421,153.03
Job Installation Cost 435,893.39
Grand Total 19,405,125.08

Production Timeline

d
Assembly 1h 37m 56s
1
S-R Trigger Neurolink Conduit
S-R Trigger Neurolink Conduit M
1 job, 1 run 1h 37m 56s/job 1h 37m 56s
Total Wall Clock Time 1h 37m 56s

Required Skills

Industry III