Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Probe Fleet Issue Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,359,538.14
ISK
Sell Value
10,000,000.00
Profit
+8,640,461.86
ISK
Margin
86.4%
Build Time
54m 25s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 405,850.85
9 26,377.20
9 411,329.16
18 25,967.52
27 20,083.14
450 108,166.50
2,250 129,645.00
5,400 98,712.00
28,800 107,712.00
Material Total 1,333,843.37
System Cost Index (0.14%) 868.91
SCC Surcharge (4%) 24,825.86
Job Installation Cost 25,694.77
Grand Total 1,359,538.14

Production Timeline

d
Assembly 54m 25s
1
Probe Fleet Issue
Probe Fleet Issue M
1 job, 1 run 54m 25s/job 54m 25s
Total Wall Clock Time 54m 25s

Required Skills