Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Avalanche Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,429,022,902.26
ISK
Sell Value
1,622,000,000.00
Profit
+192,977,097.74
ISK
Margin
11.9%
Build Time
9d 10h 40m
1 run

Materials

9 items
Material Quantity Unit Price Total
2 382,148,148.14
5 54,027,322.40
5 72,738,022.80
5 35,710,000.00
9 129,960,000.00
9 117,633,218.40
36 545,760,000.00
180 14,610,630.60
360 16,453,166.40
Material Total 1,369,040,508.74
System Cost Index (0.14%) 2,028,390.12
SCC Surcharge (4%) 57,954,003.40
Job Installation Cost 59,982,393.52
Grand Total 1,429,022,902.26

Production Timeline

d
Assembly 9d 10h 40m
1
Avalanche
Avalanche M
1 job, 1 run 9d 10h 40m/job 9d 10h 40m
Total Wall Clock Time 9d 10h 40m

Required Skills