Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Megacyte Prospecting Array 1 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
44,477,680.81
ISK
Sell Value
0.00
Profit
-44,477,680.81
ISK
Margin
0.0%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
1 7,146,000.00
2 4,474,000.00
2 3,950,795.60
3 5,701,807.20
3 3,676,030.59
3 5,400,332.91
4 3,813,430.76
4 3,843,546.68
4 5,147,570.16
Material Total 43,153,513.90
System Cost Index (0.14%) 44,778.59
SCC Surcharge (4%) 1,279,388.32
Job Installation Cost 1,324,166.91
Grand Total 44,477,680.81

Production Timeline

d
Assembly 9h 4m 1s
1
Megacyte Prospecting Array 1
Megacyte Prospecting Array 1 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII