Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Pyerite Prospecting Array 2 Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
85,033,364.43
ISK
Sell Value
305,000,000.00
Profit
+219,966,635.57
ISK
Margin
72.1%
Build Time
9h 4m 1s
1 run

Materials

9 items
Material Quantity Unit Price Total
5 9,092,869.15
4 8,865,149.44
7 7,382,877.25
8 7,786,935.12
5 7,265,103.25
5 9,312,844.55
8 8,720,000.00
4 7,332,755.20
2 16,708,000.00
Material Total 82,466,533.96
System Cost Index (0.14%) 86,801.03
SCC Surcharge (4%) 2,480,029.44
Job Installation Cost 2,566,830.47
Grand Total 85,033,364.43

Production Timeline

d
Assembly 9h 4m 1s
1
Pyerite Prospecting Array 2
Pyerite Prospecting Array 2 M
1 job, 1 run 9h 4m 1s/job 9h 4m 1s
Total Wall Clock Time 9h 4m 1s

Required Skills

Industry IIIII