Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Sarathiel Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,467,572,179.84
ISK
Sell Value
0.00
Profit
-2,467,572,179.84
ISK
Margin
0.0%
Build Time
16d 8h 53m
1 run

Materials

21 items
Material Quantity Unit Price Total
1 170,083,333.33
1 699,938,095.24
2 24,841,731.60
2 27,120,000.00
2 28,040,000.00
2 176,216,000.00
2 176,170,958.90
4 39,836,000.00
4 48,112,000.00
4 33,374,555.12
5 86,694,117.65
5 65,224,218.75
5 79,950,000.00
8 165,343,283.60
8 98,260,598.80
9 118,530,000.00
9 72,066,913.02
9 163,822,784.85
9 85,995,000.00
180 14,506,925.40
360 16,006,089.60
Material Total 2,390,132,605.86
System Cost Index (0.14%) 2,618,729.55
SCC Surcharge (4%) 74,820,844.43
Job Installation Cost 77,439,573.98
Grand Total 2,467,572,179.84

Production Timeline

d
Assembly 16d 8h 53m
1
Sarathiel
Sarathiel M
1 job, 1 run 16d 8h 53m/job 16d 8h 53m
Total Wall Clock Time 16d 8h 53m

Required Skills