Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type B I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
411,791.90
ISK
Sell Value
203,100.00
Profit
-208,691.90
ISK
Margin
-102.8%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
563 395,090.88
Material Total 395,090.88
System Cost Index (0.14%) 564.77
SCC Surcharge (4%) 16,136.25
Job Installation Cost 16,701.02
Grand Total 411,791.90

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type B I
Erratic Ore Mining Crystal Type B I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills