Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type C I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
494,586.47
ISK
Sell Value
764,291.26
Profit
+269,704.79
ISK
Margin
35.3%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
675 474,545.25
Material Total 474,545.25
System Cost Index (0.14%) 677.72
SCC Surcharge (4%) 19,363.50
Job Installation Cost 20,041.22
Grand Total 494,586.47

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type C I
Erratic Ore Mining Crystal Type C I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills