Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type C I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
493,729.22
ISK
Sell Value
764,291.26
Profit
+270,562.04
ISK
Margin
35.4%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
675 473,688.00
Material Total 473,688.00
System Cost Index (0.14%) 677.72
SCC Surcharge (4%) 19,363.50
Job Installation Cost 20,041.22
Grand Total 493,729.22

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type C I
Erratic Ore Mining Crystal Type C I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills