Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type C I Manufacturing

Blueprint Settings

Build Components

No buildable intermediates for this blueprint.

Manufacturing Facility Settings

Total Cost
524,294.78
ISK
Sell Value
789,000.00
Profit
+264,705.23
ISK
Margin
33.5%
Build Time
2m 44s
1 run

Materials

1 items
Material Quantity Unit Price Total
675 502,078.50
Material Total 502,078.50
System Cost Index (0.14%) 751.28
SCC Surcharge (4%) 21,465.00
Job Installation Cost 22,216.28
Grand Total 524,294.78

Production Timeline

d
Assembly 2m 44s
1
Erratic Ore Mining Crystal Type C I
Erratic Ore Mining Crystal Type C I M
1 job, 1 run 2m 44s/job 2m 44s
Total Wall Clock Time 2m 44s

Required Skills