Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type A II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
462,749.37
ISK
Sell Value
0.00
Profit
-462,749.37
ISK
Margin
0.0%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 411.50
1 250,300.00
27 188,502.12
Material Total 439,213.62
System Cost Index (0.14%) 795.89
SCC Surcharge (4%) 22,739.85
Job Installation Cost 23,535.75
Grand Total 462,749.37

Production Timeline

d
Assembly 3m 56s
1
Erratic Ore Mining Crystal Type A II
Erratic Ore Mining Crystal Type A II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s