Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type B II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
442,646.08
ISK
Sell Value
1,100,000.00
Profit
+657,353.92
ISK
Margin
59.8%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 493.69
1 203,000.00
35 217,074.20
Material Total 420,567.89
System Cost Index (0.14%) 746.61
SCC Surcharge (4%) 21,331.59
Job Installation Cost 22,078.19
Grand Total 442,646.08

Production Timeline

d
Assembly 3m 56s
1
Erratic Ore Mining Crystal Type B II
Erratic Ore Mining Crystal Type B II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s