Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type B II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
469,144.47
ISK
Sell Value
1,063,694.66
Profit
+594,550.19
ISK
Margin
55.9%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 411.50
1 203,000.00
35 244,354.60
Material Total 447,766.10
System Cost Index (0.14%) 722.94
SCC Surcharge (4%) 20,655.43
Job Installation Cost 21,378.37
Grand Total 469,144.47

Production Timeline

d
Assembly 3m 56s
1
Erratic Ore Mining Crystal Type B II
Erratic Ore Mining Crystal Type B II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s