Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Erratic Ore Mining Crystal Type C II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
520,061.89
ISK
Sell Value
3,499,000.00
Profit
+2,978,938.11
ISK
Margin
85.1%
Build Time
3m 56s
1 run

Materials

3 items
Material Quantity Unit Price Total
1 411.50
1 200,100.00
41 286,243.96
Material Total 486,755.46
System Cost Index (0.14%) 1,126.30
SCC Surcharge (4%) 32,180.13
Job Installation Cost 33,306.43
Grand Total 520,061.89

Production Timeline

d
Assembly 3m 56s
1
Erratic Ore Mining Crystal Type C II
Erratic Ore Mining Crystal Type C II M
1 job, 1 run 3m 56s/job 3m 56s
Total Wall Clock Time 3m 56s