Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Layered Energized Membrane II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
336,586.35
ISK
Sell Value
482,353.33
Profit
+145,766.98
ISK
Margin
30.2%
Build Time
19m 9s
1 run

Materials

7 items
Material Quantity Unit Price Total
1 50,953.73
5 108,026.60
3 124,781.76
1 603.62
1 4,747.14
3 13,822.56
3 18,159.00
Material Total 321,094.41
System Cost Index (0.14%) 523.88
SCC Surcharge (4%) 14,968.06
Job Installation Cost 15,491.94
Grand Total 336,586.35

Production Timeline

d
Assembly 19m 9s
1
Layered Energized Membrane II
Layered Energized Membrane II M
1 job, 1 run 19m 9s/job 19m 9s
Total Wall Clock Time 19m 9s