Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scorch L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
721,509.66
ISK
Sell Value
1,052,000.00
Profit
+330,490.34
ISK
Margin
31.4%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
972 80,617.68
405 306,382.50
1 652.98
14 302,474.48
Material Total 690,127.64
System Cost Index (0.14%) 1,061.23
SCC Surcharge (4%) 30,320.79
Job Installation Cost 31,382.02
Grand Total 721,509.66

Production Timeline

d
Assembly 1h 57m 50s
1
Scorch L
Scorch L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills