Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aurora M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
326,086.56
ISK
Sell Value
1,492,290.32
Profit
+1,166,203.76
ISK
Margin
78.1%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
940 82,297.00
162 116,562.24
1 660.90
6 112,777.14
Material Total 312,297.28
System Cost Index (0.14%) 466.30
SCC Surcharge (4%) 13,322.97
Job Installation Cost 13,789.28
Grand Total 326,086.56

Production Timeline

d
Assembly 1h 18m 34s
1
Aurora M
Aurora M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills