Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aurora L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
795,303.92
ISK
Sell Value
1,289,172.04
Profit
+493,868.12
ISK
Margin
38.3%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,349 205,654.95
405 291,405.60
1 660.90
14 263,146.66
Material Total 760,868.11
System Cost Index (0.14%) 1,164.50
SCC Surcharge (4%) 33,271.32
Job Installation Cost 34,435.81
Grand Total 795,303.92

Production Timeline

d
Assembly 1h 57m 50s
1
Aurora L
Aurora L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills