Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Large Egress Port Maximizer II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
9,710,991.93
ISK
Sell Value
14,617,014.93
Profit
+4,906,023.00
ISK
Margin
33.6%
Build Time
6h 8m 14s
1 run

Materials

4 items
Material Quantity Unit Price Total
18 5,407,586.46
1 518.01
21 256,004.91
11 3,758,700.00
Material Total 9,422,809.38
System Cost Index (0.14%) 9,745.30
SCC Surcharge (4%) 278,437.25
Job Installation Cost 288,182.55
Grand Total 9,710,991.93

Production Timeline

d
Assembly 6h 8m 14s
1
Large Egress Port Maximizer II
Large Egress Port Maximizer II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s