1200mm Artillery Cannon II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
3,061,273.42
ISK
Sell Value
2,802,155.34
Profit
-259,118.08
ISK
Margin
-9.2%
Build Time
57m 27s
1 run

Materials

5 items
Material Quantity Unit Price Total
33 709,829.01
1 649,155.64
13 1,069,603.60
32 495,694.08
1 653.79
Material Total 2,924,936.12
System Cost Index (0.14%) 4,610.44
SCC Surcharge (4%) 131,726.86
Job Installation Cost 136,337.30
Grand Total 3,061,273.42

Production Timeline

d
Assembly 57m 27s
1
1200mm Artillery Cannon II
1200mm Artillery Cannon II M
1 job, 1 run 57m 27s/job 57m 27s
Total Wall Clock Time 57m 27s

Required Skills