Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Small Cargohold Optimization II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
402,892.47
ISK
Sell Value
1,175,347.83
Profit
+772,455.36
ISK
Margin
65.7%
Build Time
2h 2m 45s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 300,400.00
1 603.62
1 12,190.00
1 72,290.00
Material Total 385,483.62
System Cost Index (0.14%) 588.70
SCC Surcharge (4%) 16,820.14
Job Installation Cost 17,408.85
Grand Total 402,892.47

Production Timeline

d
Assembly 2h 2m 45s
1
Small Cargohold Optimization II
Small Cargohold Optimization II M
1 job, 1 run 2h 2m 45s/job 2h 2m 45s
Total Wall Clock Time 2h 2m 45s