Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Capital Bay Loading Accelerator II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
461,068,545.65
ISK
Sell Value
378,900,000.00
Profit
-82,168,545.65
ISK
Margin
-21.7%
Build Time
8h 10m 58s
1 run

Materials

4 items
Material Quantity Unit Price Total
108 30,456,000.00
156 408,720,000.00
1 668.59
122 19,154,000.00
Material Total 458,330,668.59
System Cost Index (0.14%) 92,585.21
SCC Surcharge (4%) 2,645,291.85
Job Installation Cost 2,737,877.06
Grand Total 461,068,545.65

Production Timeline

d
Assembly 8h 10m 58s
1
Capital Bay Loading Accelerator II
Capital Bay Loading Accelerator II M
1 job, 1 run 8h 10m 58s/job 8h 10m 58s
Total Wall Clock Time 8h 10m 58s