Large Transverse Bulkhead II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
54,302,256.20
ISK
Sell Value
66,000,000.00
Profit
+11,697,743.80
ISK
Margin
17.7%
Build Time
6h 8m 14s
1 run

Materials

4 items
Material Quantity Unit Price Total
1 605.32
14 308,074.06
18 1,172,658.78
21 52,623,454.38
Material Total 54,104,792.54
System Cost Index (0.14%) 6,677.51
SCC Surcharge (4%) 190,786.14
Job Installation Cost 197,463.66
Grand Total 54,302,256.20

Production Timeline

d
Assembly 6h 8m 14s
1
Large Transverse Bulkhead II
Large Transverse Bulkhead II M
1 job, 1 run 6h 8m 14s/job 6h 8m 14s
Total Wall Clock Time 6h 8m 14s