Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gleam XL Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
7,675,191.74
ISK
Sell Value
14,928,000.00
Profit
+7,252,808.26
ISK
Margin
48.6%
Build Time
4h 21m 51s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 652.98
4 5,776,000.00
27 580,769.19
810 612,335.70
4,698 389,652.12
Material Total 7,359,409.99
System Cost Index (0.14%) 10,678.61
SCC Surcharge (4%) 305,103.14
Job Installation Cost 315,781.75
Grand Total 7,675,191.74

Production Timeline

d
Assembly 4h 21m 51s
1
Gleam XL
Gleam XL M
1 job, 1 run 4h 21m 51s/job 4h 21m 51s
Total Wall Clock Time 4h 21m 51s

Required Skills