Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Gleam XL Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
5,619,645.14
ISK
Sell Value
11,313,616.16
Profit
+5,693,971.02
ISK
Margin
50.3%
Build Time
4h 21m 51s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 660.90
4 3,804,800.00
27 507,497.13
810 582,811.20
4,698 411,309.90
Material Total 5,307,079.13
System Cost Index (0.14%) 10,569.87
SCC Surcharge (4%) 301,996.15
Job Installation Cost 312,566.01
Grand Total 5,619,645.14

Production Timeline

d
Assembly 4h 21m 51s
1
Gleam XL
Gleam XL M
1 job, 1 run 4h 21m 51s/job 4h 21m 51s
Total Wall Clock Time 4h 21m 51s

Required Skills