Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Hybrid Reactor Time Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
1,739,816,547.03
ISK
Sell Value
2,597,000,000.00
Profit
+857,183,452.97
ISK
Margin
33.0%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 538.26
15 23,252,669.55
15 1,084,350.00
26 8,883,560.40
26 49,206,575.86
180 15,071,428.80
684 134,033,425.20
684 360,604,800.00
1,080 1,135,011,528.00
1,080 1,044,651.60
1,080 4,572,720.00
Material Total 1,732,766,247.67
System Cost Index (0.14%) 238,415.92
SCC Surcharge (4%) 6,811,883.44
Job Installation Cost 7,050,299.36
Grand Total 1,739,816,547.03

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set Hybrid Reactor Time Efficiency II
Standup M-Set Hybrid Reactor Time Efficiency II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII