Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Biochemical Reactor Time Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,294,922,623.77
ISK
Sell Value
2,597,000,000.00
Profit
+302,077,376.23
ISK
Margin
11.6%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 669.40
15 37,804,707.45
15 977,293.50
26 3,946,800.00
26 44,146,172.20
180 18,108,432.00
684 107,388,000.00
684 301,409,538.48
1,080 1,767,770,892.00
1,080 1,007,121.60
1,080 5,071,680.00
Material Total 2,287,631,306.63
System Cost Index (0.14%) 246,566.28
SCC Surcharge (4%) 7,044,750.86
Job Installation Cost 7,291,317.14
Grand Total 2,294,922,623.77

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set Biochemical Reactor Time Efficiency II
Standup M-Set Biochemical Reactor Time Efficiency II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII