Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Reactor Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
22,722,554,605.77
ISK
Sell Value
25,230,000,000.00
Profit
+2,507,445,394.23
ISK
Margin
9.9%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 669.24
144 360,846,544.32
144 9,381,270.24
252 38,253,600.00
252 427,997,198.16
1,800 181,080,000.00
6,840 1,073,880,000.00
6,840 3,016,105,592.40
10,800 17,481,308,868.00
10,800 10,071,108.00
10,800 50,716,800.00
Material Total 22,649,641,650.36
System Cost Index (0.14%) 2,465,655.50
SCC Surcharge (4%) 70,447,299.92
Job Installation Cost 72,912,955.41
Grand Total 22,722,554,605.77

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Reactor Efficiency II
Standup L-Set Reactor Efficiency II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII