Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aurora M Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
327,632.55
ISK
Sell Value
1,462,072.00
Profit
+1,134,439.45
ISK
Margin
77.6%
Build Time
1h 18m 34s
1 run

Materials

4 items
Material Quantity Unit Price Total
940 81,817.60
162 114,696.00
1 661.10
6 116,355.60
Material Total 313,530.30
System Cost Index (0.14%) 476.89
SCC Surcharge (4%) 13,625.36
Job Installation Cost 14,102.25
Grand Total 327,632.55

Production Timeline

d
Assembly 1h 18m 34s
1
Aurora M
Aurora M M
1 job, 1 run 1h 18m 34s/job 1h 18m 34s
Total Wall Clock Time 1h 18m 34s

Required Skills