Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Aurora L Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
798,572.91
ISK
Sell Value
1,289,200.00
Profit
+490,627.09
ISK
Margin
38.1%
Build Time
1h 57m 50s
1 run

Materials

4 items
Material Quantity Unit Price Total
2,349 204,456.96
405 286,740.00
1 661.10
14 271,496.40
Material Total 763,354.46
System Cost Index (0.14%) 1,190.96
SCC Surcharge (4%) 34,027.49
Job Installation Cost 35,218.45
Grand Total 798,572.91

Production Timeline

d
Assembly 1h 57m 50s
1
Aurora L
Aurora L M
1 job, 1 run 1h 57m 50s/job 1h 57m 50s
Total Wall Clock Time 1h 57m 50s

Required Skills