Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Scorch XL Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
2,812,957.89
ISK
Sell Value
6,316,000.00
Profit
+3,503,042.11
ISK
Margin
55.5%
Build Time
2h 27m 18s
1 run

Materials

5 items
Material Quantity Unit Price Total
1 661.10
4 1,391,200.00
27 523,600.20
810 573,480.00
1,944 169,205.76
Material Total 2,658,147.06
System Cost Index (0.14%) 5,235.15
SCC Surcharge (4%) 149,575.68
Job Installation Cost 154,810.83
Grand Total 2,812,957.89

Production Timeline

d
Assembly 2h 27m 18s
1
Scorch XL
Scorch XL M
1 job, 1 run 2h 27m 18s/job 2h 27m 18s
Total Wall Clock Time 2h 27m 18s

Required Skills