Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Drone and Fighter Manufacturing Material Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
972,329,970.59
ISK
Sell Value
1,990,000,000.00
Profit
+1,017,670,029.41
ISK
Margin
51.1%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 669.40
15 4,230,000.00
18 45,365,648.94
26 572,063.96
180 294,628,482.00
180 27,324,000.00
180 703,245.60
900 839,268.00
1,080 108,650,592.00
1,080 475,909,797.60
1,080 5,071,680.00
Material Total 963,295,447.50
System Cost Index (0.14%) 305,515.27
SCC Surcharge (4%) 8,729,007.82
Job Installation Cost 9,034,523.09
Grand Total 972,329,970.59

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
Standup M-Set Drone and Fighter Manufacturing Material Efficiency II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII