Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Basic Medium Ship Manufacturing Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
9,721,425,409.21
ISK
Sell Value
19,970,000,000.00
Profit
+10,248,574,590.79
ISK
Margin
51.3%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 634.69
144 40,608,000.00
180 453,656,489.40
252 5,544,619.92
1,800 2,946,284,820.00
1,800 273,240,000.00
1,800 7,032,456.00
9,000 8,392,680.00
10,800 1,086,505,920.00
10,800 4,759,097,976.00
10,800 50,716,800.00
Material Total 9,631,080,396.01
System Cost Index (0.14%) 3,055,145.37
SCC Surcharge (4%) 87,289,867.82
Job Installation Cost 90,345,013.20
Grand Total 9,721,425,409.21

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Basic Medium Ship Manufacturing Efficiency II
Standup L-Set Basic Medium Ship Manufacturing Efficiency II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII