Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup L-Set Basic Large Ship Manufacturing Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
9,830,536,343.72
ISK
Sell Value
19,970,000,000.00
Profit
+10,139,463,656.28
ISK
Margin
50.8%
Build Time
6h 48m
1 run

Materials

11 items
Material Quantity Unit Price Total
1 639.68
144 42,494,400.00
180 491,161,849.20
252 5,064,025.68
1,800 2,707,462,602.00
1,800 327,600,000.00
1,800 6,901,362.00
9,000 8,375,490.00
10,800 1,113,393,276.00
10,800 4,990,237,956.00
10,800 51,132,168.00
Material Total 9,743,823,768.56
System Cost Index (0.14%) 2,932,309.30
SCC Surcharge (4%) 83,780,265.85
Job Installation Cost 86,712,575.16
Grand Total 9,830,536,343.72

Production Timeline

d
Assembly 6h 48m
1
Standup L-Set Basic Large Ship Manufacturing Efficiency II
Standup L-Set Basic Large Ship Manufacturing Efficiency II M
1 job, 1 run 6h 48m/job 6h 48m
Total Wall Clock Time 6h 48m

Required Skills

Industry IIIII