Industry Calculator

Calculate manufacturing and reaction costs, time, and profit for any blueprint.

Standup M-Set Basic Large Ship Manufacturing Time Efficiency II Manufacturing

Blueprint Settings

Build Components

| |

Manufacturing Facility Settings

Total Cost
960,685,081.02
ISK
Sell Value
2,093,000,000.00
Profit
+1,132,314,918.98
ISK
Margin
54.1%
Build Time
4h 32m 1s
1 run

Materials

11 items
Material Quantity Unit Price Total
1 596.86
15 4,506,000.00
18 27,909,358.02
26 316,940.00
180 189,167,274.00
180 61,505,029.80
180 2,835,597.60
900 870,552.00
1,080 90,384,800.40
1,080 569,376,000.00
1,080 4,572,720.00
Material Total 951,444,868.68
System Cost Index (0.14%) 312,470.95
SCC Surcharge (4%) 8,927,741.39
Job Installation Cost 9,240,212.34
Grand Total 960,685,081.02

Production Timeline

d
Assembly 4h 32m 1s
1
Standup M-Set Basic Large Ship Manufacturing Time Efficiency II
Standup M-Set Basic Large Ship Manufacturing Time Efficiency II M
1 job, 1 run 4h 32m 1s/job 4h 32m 1s
Total Wall Clock Time 4h 32m 1s

Required Skills

Industry IIIII